Pre-cut circular openings in the floor slabs based on the provided layout.
Hole Diameter : Should be Chute Diameter + 50-100mm.
Precision Placement : Ensure vertical alignment across all floors.
Fire safety is paramount in high-rise laundry chutes.
Fire Foam & Sealant: Fill the gap between the chute and floor slab with certified fire-rated materials.
Intumescent Seals: Prevent the spread of smoke and fire through floor penetrations.
According to UK/EU standards, the chute body must be enclosed within a fire-rated shaft.
Materials : Typically constructed using fire-rated plasterboard.
Access Panels : Install fire-rated access panels for future maintenance.
[Get Technical Support] Ensure your project meets local building codes.
Next Step : [Modular Assembly & Jointing ]